sales@bergmaninc.com
Area to be repaired.
Infrared heating unit being lowered over the pothole.
Etching the outer edge of the heated patch area and raking the old blacktop.
Adding fresh 300 degree blacktop before final raking.
Rolling and compacting the blacktop with a vibratory roller.
Patch completed in approximately 15 minutes.
Home | Divisions | Services | Company History | Affiliations | Events | Projects | Jobs | Contact Us | Request a Quote | Site Map
Copyright © Bergman Companies, Inc. Website design and hosting by First Net Impressions